Woljeong Demonstration Offshore Wind Farm

01 Dec 2023: Update April 2023: the developers plan to re-start operation by the end of this year. Update January 2023: There has been no sign of a grid connection agreement by the end of 2022 so the expected date has been pushed back to June 2023. July 2022: The wind farm operators are expected to have a grid connection agreement with KEPCO by the end of the year. There are plans to begin operation of the 5 MW wind farm again (convert the demonstration into a commercial wind farm).
Location:
South Korea
Status:
Decommissioned
Capacity:
5 MW
4C Offshore | Location Map: Lat(33.576) Lon(126.787)

Subscribers can track wind farms on their dashboard.

General Information
Name
Woljeong Demonstration
Other Names
Woljeongri; 월정리; Woljeon Offshore Demonstrator Project; 해상풍력 발전기인 월정 실증; The demonstrative offshore windpark of Jeju Island
Country
South Korea
Development Status
Decommissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

KIER - Korea Institute of Energy Research (한국에너지기술연구원)

KIER - Korea Institute of Energy Research (한국에너지기술연구원)

Owner

KIER - Korea Institute of Energy Research (한국에너지기술연구원)

KIER - Korea Institute of Energy Research (한국에너지기술연구원)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
5 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Japan Sea
Latitude
33.575574°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life