Yokjido - Demonstration Offshore Wind Farm

26 Jun 2018: Project promoted at the "Offshore Wind Power Industrialisation Strategy Forum" hosted by the Ministry of Trade, Industry, and Energy (MOTIE) in Seoul. At the event consortiums were selected to develop the five 100-220 MW demonstration projects, that have been instigated by the local governments of Gunsan, Yeonggwang, Yeongdeok, Tongyeong and Ulsan. It is hoped that the projects will promote and develop local supply chains, for offshore wind projects. If the small scale demonstration projects are completed, larger projects are planned to follow.
Location:
South Korea
Status:
Concept/Early Planning
Capacity:
100 MW
4C Offshore | Location Map: Lat(34.587) Lon(128.213)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
100 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Korea Strait
Latitude
34.586691°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life