4C Offshore Empowering Intelligence
Welcome
sikorskywilliam

Asa Branca I - CEMAB I Offshore Wind Farm

25 Jul 2019: The EIA of the 720 MW project has been interviewed by the 4 intervening agencies, without any opposition. The Brazilian Electricity Regulatory Agency (ANNEL) awarded a pre-consent (Despacho de Registro de Outorga (DRO)) for this project, while IBAMA will hold a venue where the EIA of all the three offshore wind projects will be presented. Eolica Brazil foresee the environmental preliminary licensing next year. Also, an incentive for a PPA (on a Feed-in-Tariffs scheme) is possible to be released in end-2019/early-2020.
Location:
Brazil
Status:
Consent Application Submitted
Capacity:
400 MW
4C Offshore | Location Map: Lat(-2.955) Lon(-39.651)

Subscribers can track wind farms on their dashboard.

Hello sikorskywilliam, you are logged in as a Freemium user. To gain additional information login as a Full Access user.

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Upgrade now!
Power & Turbines
Windfarm Capacity
400 MW
Other Turbine(s) Used
Upgrade your subscription to include Wind Farms
Min. Turbine Capacity (MW)
Upgrade your subscription to include Wind Farms or Cable
Max. Turbine Capacity (MW)
Upgrade your subscription to include Wind Farms or Cable
Max. Number of Turbines
Upgrade your subscription to include Wind Farms or Cable
Total Turbine Height
Upgrade your subscription to include Wind Farms
Hub Height
Upgrade your subscription to include Wind Farms
Rotor Diameter
Upgrade your subscription to include Wind Farms
Foundation Type
Grounded: Not Specified
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable
Foundation Comments
Upgrade your subscription to include Wind Farms

Location & Environment
Sea Name
Atlantic Ocean
Latitude
-2.955079°
Longitude
Upgrade your subscription to include Wind Farms or Cable
Area
72.24 km2
Depth Range (Chart Datum)
Upgrade your subscription to include Wind Farms or Cable
Depth Range (Stated by Developer)
Upgrade your subscription to include Wind Farms or Cable
Distance from Shore (Developer)
3 km
Distance from Shore (Computed)
Upgrade your subscription to include Wind Farms or Cable

Ports
Installation Base

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Upgrade your subscription to include Wind Farms or Cable
Grid Connection Point
Upgrade your subscription to include Wind Farms or Cable
Cable Landing Point
Upgrade your subscription to include Wind Farms or Cable

Export Cables (AC & DC)
Number of Export Cables (AC)
3
Average Length per Cable (AC)
Upgrade your subscription to include Wind Farms or Cable
Additional Requirements (AC)
Upgrade your subscription to include Wind Farms or Cable
Nominal Voltage (AC)
Upgrade your subscription to include Wind Farms or Cable
Additional Requirements (DC)
Upgrade your subscription to include Wind Farms or Cable
Nominal Voltage (DC)
Upgrade your subscription to include Wind Farms or Cable

Nominal Voltage
Upgrade your subscription to include Wind Farms or Cable
Comments
Upgrade your subscription to include Wind Farms or Cable

Onshore Cables
Number of Onshore Cables
Average Length per Cable
116.68 km
Comments
Upgrade your subscription to include Wind Farms or Cable
Expected Life
Upgrade your subscription to include Wind Farms