11 May 2022: Greenalia has completed geophysical survey  in San Bartolomé de Tirajana, prepared by ECOS. The results of this campaign have confirmed the analysis carried out within the Environmental Impact Study (EIA), prepared in 2020, and has also allowed to obtain a greater knowledge of the biodiversity of the seabed. These works show the compatibility with the environment and the reduced environmental impact that the project could generate. The study has been developed over two months in which a bathymetric and morphological survey of the seabed of great precision has been carried out, which has allowed to advance in in-depth analysis of the benthic communities (the different aquatic ecosystems) and underwater archaeology.
Location:
Spain
Status:
Concept/Early Planning
Capacity:
50 MW
4C Offshore | Location Map: Lat(27.787) Lon(-15.374)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
50 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Atlantic Ocean
Latitude
27.787018°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life