Hai Long 2A Offshore Wind Farm

22 Jul 2022: Today, Cathay United Bank announced that it will loan 150 billion yuan/NTD (4,95 billion EUR at current rates) to the Hailong project. This includes all three sites of Hai Long 2a, 2b, & 3. The agreement states that the loan period is for 20 years, this is the largest ever loan/investment in a wind farm project in Taiwan's history.
Location:
Taiwan
Status:
Pre-Construction
Capacity:
300 MW
4C Offshore | Location Map: Lat(24.002) Lon(119.869)

Subscribers can track wind farms on their dashboard.

General Information
Name
Hai Long 2A
Other Names
ZoP19 海龍二號離岸風力發電計畫 Changhua 2-2 - Development Zone
Country
Taiwan
Development Status
Pre-Construction
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation
EPC(I)-Turnkey Windfarm

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
TWD 5516/MWh (EUR 173.69/MWh)

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
300 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Taiwan Strait
Latitude
24.002281°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life