Hai Long 3 Offshore Wind Farm

20 Apr 2022: Updated 20th April 2022: Hailong 2 and 3 have again passed the EIA review this time with additional changes of using 3 legged foundations and promising to the reduction in decible levels during contruction of the windfarms. Hai Long 2 and 3 initally past the EIA on 30th June 2021. Hai Long 2 and 3 offshore wind farms didn't pass EIA before because of many changes they made such as increasing the capacity of wind turbine, decreasing the number and the design of bird corridor.
Location:
Taiwan
Status:
Concept/Early Planning
Capacity:
512 MW
4C Offshore | Location Map: Lat(24.018) Lon(119.776)

Subscribers can track wind farms on their dashboard.

General Information
Name
Hai Long 3
Other Names
ZoP18 海龍三號離岸風力發電計畫 Changhua 2-1 - Development Zone
Country
Taiwan
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation
EPC(I)-Turnkey Windfarm

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
TWD 2502.5/MWh (EUR 78.8/MWh)

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
512 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Taiwan Strait
Latitude
24.017893°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life