Penghu - TGC Offshore Wind Farm

Status:
Cancelled
Capacity:
Location:
Taiwan

Subscribers can track wind farms on their dashboard



General Information
Name
Penghu - TGC
Other names
澎湖離岸風場
Country
Taiwan
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Website
Upgrade your subscription to include Wind Farms or Cable unlock

Developers/Owners/Operators
Type
Organisation

Offshore Construction Starts
Upgrade your subscription to include Wind Farms or Cable unlock
Submitted For Consent
Upgrade your subscription to include Wind Farms or Cable unlock
Consent Authorised
Upgrade your subscription to include Wind Farms or Cable unlock
Financial Close
Upgrade your subscription to include Wind Farms or Cable unlock
First Power
Upgrade your subscription to include Wind Farms or Cable unlock
Full Commissioning
Upgrade your subscription to include Wind Farms or Cable unlock

Revenue mechanism
Upgrade your subscription to include Wind Farms unlock
Revenue details
Upgrade your subscription to include Wind Farms unlock

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
25 Aug 2016: TAIWAN OFFSHORE WIND STRATEGY UPDATE Analysis by Taiwan's Industrial Technology Research Institute (ITRI) estimates 1.2GW of wind is feasible in waters shallower than 20m, with a further 5GW in depths of 20m-50m. Supervised by the Bureau of Energy, Taiwan's Thousand Wind Turbine programme is a 3-phased approach to realising this potential via; 1. A short-term target of 4 demonstration offshore wind turbines by 2016 2. A mid-term target of 520MW by 2020 achieved through three demonstration wind farms 3. A long-term target of 3000MW by 2025 achieved through zonal development In this nascent market, supply constraints are likely to be a challenge to delivering the required compound annual growth rate of installations of around 100%. Additionally, typical project development times of 6-9 years means some capacity will likely be delivered later. The 2009 Renewable Energy Development act supports annually reviewed feed-in tariffs available as either NT$5.7405(€15.6c)/kWh for 20 years or NT$7.1085(€19.3c)/kWh for the first 10 years followed by NT$3.4586(€9.4c)/kWh for the next 10 years. 36 "Zones of Potential" off the shallower (<50m), resource endowed west coast were identified in July 2015 and are currently being investigated by applicants with the aim of obtaining EIA approval during 2017 for projects in excess of 100MW per zone. A Strategic Environmental Assessment (SEA) has been completed and approved by the Environmental Protection Administration (EPA) in July 2016. The SEA, which will be used to identify sites for commercial scale wind farms, recognises the need to protect the critically-endangered white dolphin found in the shallow waters of the west coast. The capacity of the zones will be adjusted in accordance with the SEA findings. From 2017 zones will be announced for development, with up to 500-2000MW released every three years and awarded based on qualitative criteria including paid-in capital and financial conditions; consortium composition and capabilities; schedule of development and domestic supply chain benefits. Strong fundamental forces are driving Taiwan's ambitions. Nuclear power is being phased out and high forest and mountain coverage is constraining onshore wind growth. High wind speeds, manageable distances to shore and water depth, plus strong political support with solid legal and financial institutions provide attractive conditions for investment.
Power & Turbines
Windfarm capacity
Turbine model
Unlock with a freemium account
Other turbine(s) used
Upgrade your subscription to include Wind Farms unlock
Min. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Max. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Upgrade your subscription to include Wind Farms or Cable unlock
Total turbine height
Upgrade your subscription to include Wind Farms unlock
Hub height
Upgrade your subscription to include Wind Farms unlock
Rotor diameter
Upgrade your subscription to include Wind Farms unlock
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable unlock
Foundation comments
Upgrade your subscription to include Wind Farms unlock

Location & Environment
Sea name
Formosa Strait
Latitude
23.540553°
Longitude
Upgrade your subscription to include Wind Farms or Cable unlock
Area
Unlock with a freemium account
Depth range (chart datum)
Upgrade your subscription to include Wind Farms or Cable unlock
Depth range (stated by developer)
Upgrade your subscription to include Wind Farms or Cable unlock
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Upgrade your subscription to include Wind Farms or Cable unlock

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Upgrade your subscription to include Wind Farms or Cable unlock
Grid connection point
Upgrade your subscription to include Wind Farms or Cable unlock
Cable landing point
Upgrade your subscription to include Wind Farms or Cable unlock

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Additional requirements (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (DC)
Upgrade your subscription to include Wind Farms or Cable unlock

Nominal voltage
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Expected life
Upgrade your subscription to include Wind Farms unlock

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore