Taipower IIa Offshore Wind Farm

30 Nov 2021: Update in September 2021: The geological surveys will be delayed till 30th November 2021. According to Maritime and Port Bureau, MOTC, geological surveys will be conducted from 3rd March 2021 to 31st August 2021. The vessels used are MV Solaris 爍拉麗絲號, MV Solaris Ⅱ 爍拉麗絲 2 號 , MV Polaris Australis 奧黛麗絲號, MV Polaris 寶拉麗絲號, MV Dolphin Geo Survey 海豚地質號.
Location:
Taiwan
Status:
Concept/Early Planning
Capacity:
300 MW
4C Offshore | Location Map: Lat(24.080) Lon(120.192)

Subscribers can track wind farms on their dashboard.

General Information
Name
Taipower IIa
Other Names
離岸風力發電第二期 台电离岸风力发电项目 台电离岸风电二期 ZoP 26 Taipower Offshore Wind Project Phase II (Changhua Phase II)
Country
Taiwan
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation
EPC(I)-Turnkey Windfarm

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
300 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Taiwan Strait
Latitude
24.079778°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life