31 Aug 2023: Shimizu Corporation, owner of the Blue Wind foundation/turbine installation vessel, signed a time charter contract with Fred. Olsen Windcarrier Operations AS (FOWIC) for a period of more than 200 days plus extension options. Blue Wind will commence operations for monopile installation in February 2024 at Yunlin offshore wind farm. Blue Wind will start preparing for the Yunlin project in December 2023.
Location:
Taiwan
Status:
Partial Generation/Under Construction
Capacity:
640 MW
4C Offshore | Location Map: Lat(23.589) Lon(120.027)

Subscribers can track wind farms on their dashboard.

General Information
Name
Yunlin
Other Names
雲林允能離岸風場; 雲林離岸風力發電廠興建計畫; Yuneng; Yunneng
Country
Taiwan
Development Status
Partial Generation/Under Construction
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Wind power co., Ltd (風力發電股份有限公司)

Wind power co., Ltd (風力發電股份有限公司)

Operator

wpd AG

wpd AG

Owner

TotalEnergies

TotalEnergies

Owner

Sojitz Corporation Japan

Sojitz Corporation Japan

Owner

Electricity Generating Public Company Limited (“EGCO”)

Electricity Generating Public Company Limited (“EGCO”)

Owner

WPD offshore GmbH

WPD offshore GmbH


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
TWD 5800/MWh (EUR 182.64/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
640 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
South China Sea
Latitude
23.588949°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life