4C Offshore Empowering Intelligence
01 Jan 2024: Vattenfall plan to install a hydrogen demonstrator, by retrofitting one of the existing turbine transition pieces, to be operational in 2024/25. The lifetime of the project is likely to be between 8-10 years, which is the lifetime of the electrolyser system. The current OWF is licenced until July 2043.
Location:
United Kingdom
Status:
Fully Commissioned
Capacity:
93.2 MW
4C Offshore | Location Map: Lat(57.226) Lon(-1.997)

Subscribers can track wind farms on their dashboard.

General Information
Name
Aberdeen (EOWDC)
Other Names
Aberdeen Bay, European Offshore Wind Deployment Centre - EOWDC, AOWF
Country
United Kingdom
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Aberdeen Offshore Wind Ltd

Aberdeen Offshore Wind Ltd

EPC(I)-Balance of Plant

Royal Boskalis Westminister N.V.

Royal Boskalis Westminister N.V.

Operator

Aberdeen Offshore Wind Ltd

Aberdeen Offshore Wind Ltd

Owner

Vattenfall Wind Power Ltd

Vattenfall Wind Power Ltd


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
GBP 137.804/MWh (EUR 160.04/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
93.2 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
57.225709°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life