Aberdeen Offshore Wind Farm (EOWDC) Offshore Wind Farm

Status:
Fully Commissioned
Capacity:
93.2 MW
Location:
United Kingdom

Subscribers can track wind farms on their dashboard



General Information
Name
Aberdeen Offshore Wind Farm (EOWDC)
Other names
Aberdeen Bay, European Offshore Wind Deployment Centre - EOWDC
Country
United Kingdom
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Website
Upgrade your subscription to include Wind Farms or Cable unlock

Developers/Owners/Operators
Type
Organisation
EPC(I)-Balance of Plant

Offshore Construction Starts
Upgrade your subscription to include Wind Farms or Cable unlock
Submitted For Consent
Upgrade your subscription to include Wind Farms or Cable unlock
Consent Authorised
Upgrade your subscription to include Wind Farms or Cable unlock
Financial Close
Upgrade your subscription to include Wind Farms or Cable unlock
First Power
Upgrade your subscription to include Wind Farms or Cable unlock
Full Commissioning
Upgrade your subscription to include Wind Farms or Cable unlock

Revenue mechanism
Upgrade your subscription to include Wind Farms unlock
Revenue details
Upgrade your subscription to include Wind Farms unlock
Revenue (MWh)
137.8
Revenue (EUR/MWh)
156.24

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
07 Jan 2020: Update 7th January 2020: Approval was granted for lifetime extension. On 11 April 2019, Vattenfall submitted an application to the Scottish Ministers for the variation of the existing consent to extend it from 22 to 25 years (excluding decommissioning), in order to align with the design life of the wind farm assets. Specifically, the MHI Vestas V164-8.0 MW turbines have a structural design life of 25 years, indicating that they do not require additional maintenance in excess of manufacturers’ recommendations over this time period. Final Commissioning took place on the 25th July 2018; therefore according to the original consents the wind farm will be operational until 25th July 2040. The current Marine Licence 04309/18/3 remains in force until 31st December 2041 therefore is valid for approximately 23 years after Final Commissioning. Vattenfall requested a screening opinion from Marine Scotland for a potential extension in September 2018. A screening opinion was given by Marine Scotland in December 2018 confirming that an EIA is not required for the variation.
Power & Turbines
Windfarm capacity
93.2 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Upgrade your subscription to include Wind Farms unlock
Min. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Max. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Upgrade your subscription to include Wind Farms or Cable unlock
Total turbine height
Upgrade your subscription to include Wind Farms unlock
Hub height
Upgrade your subscription to include Wind Farms unlock
Rotor diameter
Upgrade your subscription to include Wind Farms unlock
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable unlock
Foundation comments
Upgrade your subscription to include Wind Farms unlock

Location & Environment
Sea name
North Sea, Northern North Sea (Cromarty)
Latitude
57.225709°
Longitude
Upgrade your subscription to include Wind Farms or Cable unlock
Area
Unlock with a freemium account
Depth range (chart datum)
Upgrade your subscription to include Wind Farms or Cable unlock
Depth range (stated by developer)
Upgrade your subscription to include Wind Farms or Cable unlock
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Upgrade your subscription to include Wind Farms or Cable unlock

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
0
Shared platform type
Upgrade your subscription to include Wind Farms or Cable unlock
Grid connection point
Upgrade your subscription to include Wind Farms or Cable unlock
Cable landing point
Upgrade your subscription to include Wind Farms or Cable unlock

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Additional requirements (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Number of export cables (DC)
0
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (DC)
Upgrade your subscription to include Wind Farms or Cable unlock

Nominal voltage
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Expected life
Upgrade your subscription to include Wind Farms unlock

Copyright © 4C Offshore 2020

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore