Status:
Decommissioned
Capacity:
4 MW
Location:
United Kingdom

Subscribers can track wind farms on their dashboard



General Information
Name
Blyth
Country
United Kingdom
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Website
Upgrade your subscription to include Wind Farms or Cable unlock

Developers/Owners/Operators
Type
Organisation

Offshore Construction Starts
Upgrade your subscription to include Wind Farms or Cable unlock
Submitted For Consent
Upgrade your subscription to include Wind Farms or Cable unlock
Consent Authorised
Upgrade your subscription to include Wind Farms or Cable unlock
Financial Close
Upgrade your subscription to include Wind Farms or Cable unlock
First Power
Upgrade your subscription to include Wind Farms or Cable unlock
Full Commissioning
Upgrade your subscription to include Wind Farms or Cable unlock

Revenue mechanism
Upgrade your subscription to include Wind Farms unlock
Revenue details
Upgrade your subscription to include Wind Farms unlock
Revenue (MWh)
98.78
Revenue (EUR/MWh)
112

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
20 Apr 2019: update: The vessel Excalibur arrived on site to commence turbine decommissioning preparation works on 8th April and C-Fenna arrived on site on 4th April to remove the cables. However, unfavourable weather conditions caused delays and decommissioning commenced on the 20th April. The two Vestas V66-2MW turbines were taken down over four days from the 20th-24th April using the vessel Excalibur. The rest of the decommissioning work is ongoing with C-Fenna undertaking export cable removal. One turbine is expected to be recycled and reused for spare parts within E.ON’s onshore wind assets, whilst the other is to be used by the Port of Blyth for training purposes. Although expected in 2018, Blyth will be decommissioned in 2019, with work starting in April which will take four to six weeks. The preferred operations port for decommissioning activities is the Port of Blyth. The two turbines, foundations and cabling will be removed followed by remedial site works. A post decommissioning geophysical [bathymetric] survey of the site will be completed in order to provide further evidence of the complete removal of the foundation and the infilling of the voids. Decommissioning is scheduled to start at earliest on the 8th of April, and take 3 weeks.
Power & Turbines
Windfarm capacity
4 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Upgrade your subscription to include Wind Farms unlock
Min. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Max. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Upgrade your subscription to include Wind Farms or Cable unlock
Total turbine height
Upgrade your subscription to include Wind Farms unlock
Hub height
Upgrade your subscription to include Wind Farms unlock
Rotor diameter
Upgrade your subscription to include Wind Farms unlock
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable unlock
Foundation comments
Upgrade your subscription to include Wind Farms unlock

Location & Environment
Sea name
North Sea, Northern North Sea (Tyne)
Latitude
55.136086°
Longitude
Upgrade your subscription to include Wind Farms or Cable unlock
Area
Unlock with a freemium account
Depth range (chart datum)
Upgrade your subscription to include Wind Farms or Cable unlock
Depth range (stated by developer)
Upgrade your subscription to include Wind Farms or Cable unlock
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Upgrade your subscription to include Wind Farms or Cable unlock

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
0
Shared platform type
Upgrade your subscription to include Wind Farms or Cable unlock
Grid connection point
Upgrade your subscription to include Wind Farms or Cable unlock
Cable landing point
Upgrade your subscription to include Wind Farms or Cable unlock

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Additional requirements (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (DC)
Upgrade your subscription to include Wind Farms or Cable unlock

Nominal voltage
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Expected life
Upgrade your subscription to include Wind Farms unlock

Copyright © 4C Offshore 2020

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore