27 Apr 2022: Supply Chain Development Statement released - ambition is to spend £1.25 billion within the Scottish supply chain, with a firm commitment of £0.83 billion, proposal for a design with a reinforced concrete foundation has been chosen primarily because it enables maximum local content in its manufacture, firm commitment of £379 million of foundation fabrication spending in Scotland with an ambition of £462 million. Work with Scottish based consultancy and service companies during development with a commitment of £127 million and an ambition of £182 million; • Civil works to improve facilities at ports with a commitment of £37 million and an ambition of £49 million; • All O&M services to be delivered by Scottish contractors with a commitment of £62 million and an ambition of £103 million
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
500 MW
4C Offshore | Location Map: Lat(58.173) Lon(-1.801)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
58.172574°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life