06 Jun 2023: IAC Cable Installation: VIKING NEPTUN will conduct Inter Array Cable laying operations in the Dogger Bank A OWF. The Walk to Work DP2 vessel WIND OF PRIDE will assist with cable installation and termination works. The WIND OF PRIDE will commence with pull in preparation works on the 25th of May 2023 and continue installation and termination works until approximately 31st of December 2023. The VIKING NEPTUN will commence cable lay works on the 6th of June 2023. The works will be continuous, 24 hours a day.
Location:
United Kingdom
Status:
Under Construction
Capacity:
1235 MW
4C Offshore | Location Map: Lat(54.769) Lon(1.909)

Subscribers can track wind farms on their dashboard.

General Information
Name
Dogger Bank A
Other Names
Creyke Beck A, Zone 3, Project One
Country
United Kingdom
Development Status
Under Construction
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Dogger Bank Wind Farms

Dogger Bank Wind Farms

Operator

Equinor ASA (previously Statoil ASA)

Equinor ASA (previously Statoil ASA)

Owner

Eni

Eni

Owner

Equinor ASA (previously Statoil ASA)

Equinor ASA (previously Statoil ASA)

Owner

SSE Renewables (formerly Airtricity)

SSE Renewables (formerly Airtricity)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
GBP 39.65/MWh (EUR 47.09/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
1235 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea, Southern North Sea (Dogger)
Latitude
54.769475°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
2
Average Length per Cable
Comments
Expected Life