15 Jul 2022: Update October 2021: Equinor has taken the decision to extend the pre-application period for Sheringham Shoal Offshore Windfarm extension project. Equinor had originally planned to submit the Development Consent Order (DCO) application by the end of 2021, but it now intends to make its submission to the Planning Inspectorate (PINS) by early summer 2022. Equinor plans to carry out additional analysis on seabird species and further develop proposals, in case environmental mitigation and ornithology compensatory measures are required in accordance with BEIS’ new requirements. Update September 2021: The application is expected to be submitted to the Planning Inspectorate Q3 2021. update July 2020: Equinor intends to submit the Development Consent Order application by the end of 2021. Equinor will apply for a common DCO for the Sheringham and Dudgeon Extension Projects and will consult on both projects together. The application for development consent is expected to be submitted to the Planning Inspectorate Q3 2021.
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
402 MW
4C Offshore | Location Map: Lat(53.279) Lon(1.374)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
402 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea, Southern North Sea (Humber)
Latitude
53.278822°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life