ForthWind Offshore Wind Demonstration Project - phase 1 Offshore Wind Farm

22 Dec 2021: Scoping Opinion published by Marine Scotland. The Scoping Opinion identifies the scope of impacts to be addressed and the method of assessment to be used in the Environmental Impact Assessment Report (“EIA Report”) for the Development The Scottish Ministers considered the content of the Scoping Report to be sufficient.
Location:
United Kingdom
Status:
Consent Authorised
Capacity:
29.9 MW
4C Offshore | Location Map: Lat(56.165) Lon(-3.014)

Subscribers can track wind farms on their dashboard.

General Information
Name
ForthWind Offshore Wind Demonstration Project - phase 1
Other Names
2B Energy Prototype, 2B Energy Test Site, 2B Energy Powerblock
Country
United Kingdom
Development Status
Consent Authorised
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation
Developer
Owner

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
GBP 39.65/MWh (EUR 47.09/MWh)

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
29.9 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea, Northern North Sea (Forth)
Latitude
56.164963°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life