Gunfleet Sands 3 - Demonstration Project Offshore Wind Farm

Status:
Fully Commissioned
Capacity:
12 MW
Location:
United Kingdom

Subscribers can track wind farms on their dashboard



General Information
Name
Gunfleet Sands 3 - Demonstration Project
Other names
Gunfleet Sands Extension
Country
United Kingdom
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Website
Upgrade your subscription to include Wind Farms or Cable unlock

Developers/Owners/Operators
Type
Organisation
Operator-Offshore Transmission

Offshore Construction Starts
Upgrade your subscription to include Wind Farms or Cable unlock
Submitted For Consent
Upgrade your subscription to include Wind Farms or Cable unlock
Consent Authorised
Upgrade your subscription to include Wind Farms or Cable unlock
Financial Close
Upgrade your subscription to include Wind Farms or Cable unlock
First Power
Upgrade your subscription to include Wind Farms or Cable unlock
Full Commissioning
Upgrade your subscription to include Wind Farms or Cable unlock

Revenue mechanism
Upgrade your subscription to include Wind Farms unlock
Revenue details
Upgrade your subscription to include Wind Farms unlock
Revenue (MWh)
147.56
Revenue (EUR/MWh)
167.3

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
30 Jan 2015: DONG Energy submitted a pre-emptive application to the MMO that relates to works which would be undertaken should the inter array or the export cable. This operational Marine Licence will only be used in case of an unexpected fault of the array and/or export cable at the Gunfleet Sands Offshore Wind Farm. This licence is sought for the remaining operational lifetime of the Wind Farm (23 years) for the recovery and repair/replacement of up to three incidents. The duration of an individual repair is likely to be as follows: 1. Onshore mobilisation: one month 2. Execution of repair work scope: one month 3. Cable reburial and survey: one month
Power & Turbines
Windfarm capacity
12 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Upgrade your subscription to include Wind Farms unlock
Min. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Max. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Upgrade your subscription to include Wind Farms or Cable unlock
Total turbine height
Upgrade your subscription to include Wind Farms unlock
Hub height
Upgrade your subscription to include Wind Farms unlock
Rotor diameter
Upgrade your subscription to include Wind Farms unlock
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable unlock
Foundation comments
Upgrade your subscription to include Wind Farms unlock

Location & Environment
Sea name
North Sea, Southern North Sea (Thames)
Latitude
51.703777°
Longitude
Upgrade your subscription to include Wind Farms or Cable unlock
Area
Unlock with a freemium account
Depth range (chart datum)
Upgrade your subscription to include Wind Farms or Cable unlock
Depth range (stated by developer)
Upgrade your subscription to include Wind Farms or Cable unlock
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Upgrade your subscription to include Wind Farms or Cable unlock

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
0
Shared platform type
Upgrade your subscription to include Wind Farms or Cable unlock
Grid connection point
Upgrade your subscription to include Wind Farms or Cable unlock
Cable landing point
Upgrade your subscription to include Wind Farms or Cable unlock

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Additional requirements (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (DC)
Upgrade your subscription to include Wind Farms or Cable unlock

Nominal voltage
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock

Onshore Cables
Number of Onshore cables
3
Average length per cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Expected life
Upgrade your subscription to include Wind Farms unlock

Copyright © 4C Offshore 2020

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore