05 Jul 2022: Natural Resources Wales has issued its decision on the joint EIA scoping report for Llyr 1 and 2. It has determined 'that the project has the potential to have a significant effect on the environment and therefore a statutory EIA is required.' This is based on the proximity of the project to the Skomer, Skokholm and the Seas off Pembrokeshire SPA as well as impacts to marine mammals, ornithology, benthic ecology, and fisheries/navigation.
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
100 MW
4C Offshore | Location Map: Lat(51.335) Lon(-5.266)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
100 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Celtic Sea
Latitude
51.334707°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life