17 Jan 2022: Update 17th January 2022: Crown Estate Scotland announced the winners of the Scotwind leasing round. 17 projects, totalling 7,343km2 and 24.826 GW, have been selected out of a total of 74 applications, and have now been offered option agreements which reserve the rights to specific areas of seabed. A total of £699,200,000 will be paid by the successful applicants in option fees and passed to the Scottish Government for public spending. Should any application not progress to signing a full agreement, the next highest scoring application will instead be offered an option. Developers will need to apply for necessary consents and planning permissions from the Scottish Government and other bodies before Crown Estate Scotland grants full seabed leases. Plan Option Area: W1 · Scottish Power Renewables and Iberdrola Renovables Internacional SAU were awarded 754km2 for 2 GW with fixed foundations.
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
2000 MW
4C Offshore | Location Map: Lat(56.014) Lon(-6.674)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
2000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
56.014135°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life