United Kingdom 90MW Fully Commissioned

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Events overview for Barrow

Event Date Event Type Event Description Event Source
Subscribers only field Subscribers only field Subscribers only field Subscribers only field
Freemium Only 2019 Export Cable Rovco and CWind are planning to conduct geophysica... Subscribers only field Subscribers only field
Freemium Only 2019 Offshore Substation A programme of work that will involve Rock Bag Pla... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine J/U WIND carried out a major component exchange on... Subscribers only field Subscribers only field
Freemium Only 2017 Offshore Substation Dive operations at the offshore substation began o... Subscribers only field Subscribers only field
Freemium Only 2017 Foundation Dive and ROV operations will take place at turbine... Subscribers only field Subscribers only field
Freemium Only 2017 Turbine An 80 day general maintenance programme will begin... Subscribers only field Subscribers only field
Freemium Only 2017 Turbine Service Agreement Expires The service agreement extension with Vestas will e... Subscribers only field Subscribers only field
Freemium Only 2016 Export Cable The vessel Deep Volans and Deep Purple began a geo... Subscribers only field Subscribers only field
Freemium Only 2016 Foundation Divers will inspect the offshore substation positi... Subscribers only field Subscribers only field
Freemium Only 2016 Health and Safety A 10.5m catamaran fishing vessel collided with an ... Subscribers only field Subscribers only field
Freemium Only 2015 Environmental and Seabed Monitoring A geophysical survey is being undertaken on the ex... Subscribers only field Subscribers only field
Freemium Only 2015 Turbine New flooring will be installed at the offshore sub... Subscribers only field Subscribers only field
Freemium Only 2015 Turbine J/U WIND supported maintenance work on a turbine l... Subscribers only field Subscribers only field
Freemium Only 2015 Barrow OFTO were awarded approval on an applicatio... Subscribers only field Subscribers only field
Freemium Only 2015 Performance Monitoring In the period of April 2014 to March 2015 the offs... Subscribers only field Subscribers only field
Freemium Only 2014 Centrica sold it's 50% stake to DONG energy. DONG ... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Diving operations at nine turbine locations and th... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Support vessel MV POLLUX was on site carrying out ... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Diving operations began at nine turbines (A03, A04... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Self-propelled jack-up J/U WIND performed maintena... Subscribers only field Subscribers only field
Freemium Only 2014 Barrow Offshore Wind Limited applied for a Marine ... Subscribers only field Subscribers only field
Freemium Only 2014 Other The ARGUS-G performed general maintenance at the s... Subscribers only field Subscribers only field
Freemium Only 2013 Offshore Substation The remedial painting work on the offshore substat... Subscribers only field Subscribers only field
Freemium Only 2013 Array Cable Repairs to the fault on the Infield or Inter-Work ... Subscribers only field Subscribers only field
Freemium Only 2012 Turbine A gear box change was carried out on the D3 turbin... Subscribers only field Subscribers only field
Freemium Only 2012 Turbine Service Agreement Expires The initial five-year OEM service agreement with V... Subscribers only field Subscribers only field
Freemium Only 2011 Transmission assets were transferred to Transmissi... Subscribers only field Subscribers only field
Freemium Only 2011 Other The site was shut down for planned maintenance.... Subscribers only field Subscribers only field
Freemium Only 2011 Export Cable Scour protection work took place to cover sections... Subscribers only field Subscribers only field
Freemium Only 2010 Other The site was shut down for a period for planned ma... Subscribers only field Subscribers only field
Freemium Only 2010 Export Cable Inspection of export cable was scheduled to finish... Subscribers only field Subscribers only field
Freemium Only 2010 Export Cable Inspection of export cable scheduled to begin.... Subscribers only field Subscribers only field
Freemium Only 2008 Export Cable Remedial work was carried out to cover export cabl... Subscribers only field Subscribers only field
Freemium Only 2007 Turbine Gearboxes and generators on all 30 turbines were r... Subscribers only field Subscribers only field
Freemium Only 2007 Loss of Asset An oil leak resulted in some oil being discharged ... Subscribers only field Subscribers only field
Freemium Only 2006 Fully Commissioned Official opening of the wind farm.... Subscribers only field Subscribers only field
Freemium Only 2006 Turbine Problems with bearings and rotor cables on the gen... Subscribers only field Subscribers only field
Freemium Only 2006 Final Testing Final testing completed.... Subscribers only field Subscribers only field
Freemium Only 2006 Turbine Installation Turbine installation finished.... Subscribers only field Subscribers only field
Freemium Only 2006 Array Cable Installation Offshore cable installation finished.... Subscribers only field Subscribers only field
Freemium Only 2006 Generating Power First Power generated... Subscribers only field Subscribers only field
Freemium Only 2006 Final Testing Final testing started.... Subscribers only field Subscribers only field
Freemium Only 2005 Turbine Installation Turbine installation started.... Subscribers only field Subscribers only field
Freemium Only 2005 Foundation Installation Foundation installation finished.... Subscribers only field Subscribers only field
Freemium Only 2005 Offshore Substation Substation installed on monopile foundation.... Subscribers only field Subscribers only field
Freemium Only 2005 Met Mast/LiDAR Carl C A/S 15m Series 3 Tilt-Up Met Mast Tower, fi... Subscribers only field Subscribers only field
Freemium Only 2005 Export Cable Installation Offshore cable installation started.... Subscribers only field Subscribers only field
Freemium Only 2005 Foundation Installation Foundation installation started.... Subscribers only field Subscribers only field
Freemium Only 2005 Onshore Construction Starts Onshore work took place from March to August 2005.... Subscribers only field Subscribers only field
Freemium Only 2003 Consent Authorised Consenting period was 10 months which included del... Subscribers only field Subscribers only field
Freemium Only 2002 Appeal Process An appeal was made during the consenting process.... Subscribers only field Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore