Events overview for West of Duddon Sands

Event Date Event Type Event Description Event Source
Subscribers only field Subscribers only field Subscribers only field Subscribers only field
Freemium Only 2020 Turbine Ziton halted O&M work for two weeks in January 202... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Service Agreement Expires The five-year OEM service agreement will expire.... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Wind Server is continuing the blade maintenance ca... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Wind Server is continuing the blade maintenance ca... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Wind Server left site 14th July and headed to Most... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Wind Server has completed repairs at Turbine posit... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Blade repair campaign due to start June/July 2019.... Subscribers only field Subscribers only field
Freemium Only 2019 Met Mast/LiDAR The floating LiDAR buoy that was deployed just ou... Subscribers only field Subscribers only field
Freemium Only 2019 Cable On its first half year result, Orsted stated that ... Subscribers only field Subscribers only field
Freemium Only 2019 Foundation Diving Support Vessel HBC Achiever will be on site... Subscribers only field Subscribers only field
Freemium Only 2019 Other Approval The MMO approved the marine license application fo... Subscribers only field Subscribers only field
Freemium Only 2019 Other Application Submitted Orsted has applied to vary the marine license to c... Subscribers only field Subscribers only field
Freemium Only 2018 Turbine The jack up vessel ‘BOLD TERN’ can be expected on ... Subscribers only field Subscribers only field
Freemium Only 2018 Met Mast/LiDAR The FLOATING LiDAR BUOY that was deployed in the a... Subscribers only field Subscribers only field
Freemium Only 2018 Met Mast/LiDAR Floating LiDAR buoy was deployed opposite the met ... Subscribers only field Subscribers only field
Freemium Only 2018 Turbine MPI Adventure arrived on site to carry out compone... Subscribers only field Subscribers only field
Freemium Only 2018 Other Approval The Marine Management Organisation (MMO) granted a... Subscribers only field Subscribers only field
Freemium Only 2018 Other Application Submitted An application for a Marine Licence to carry out b... Subscribers only field Subscribers only field
Freemium Only 2017 Other Application Submitted An application for a Marine Licence to carry out b... Subscribers only field Subscribers only field
Freemium Only 2017 Turbine Following the completion of work at Burbo Bank, WI... Subscribers only field Subscribers only field
Freemium Only 2017 Met Mast/LiDAR On or around Monday 11th October two FLiDAR BUOYS ... Subscribers only field Subscribers only field
Freemium Only 2017 Other A wave buoy's moorings broke and it became adrift ... Subscribers only field Subscribers only field
Freemium Only 2017 Benaiah IV is to carry out a fish survey after it ... Subscribers only field Subscribers only field
Freemium Only 2017 Environmental and Seabed Monitoring A Bathymetric Survey by the Catamaran vessel Lia a... Subscribers only field Subscribers only field
Freemium Only 2017 Met Mast/LiDAR Two floating LiDAR buoys each with an associated m... Subscribers only field Subscribers only field
Freemium Only 2017 Turbine The Wind Server finished work at the Burbo Bank wi... Subscribers only field Subscribers only field
Freemium Only 2017 Array Cable Work commenced to remove and replace the inter-arr... Subscribers only field Subscribers only field
Freemium Only 2017 Array Cable Work commenced to remove and replace the inter-arr... Subscribers only field Subscribers only field
Freemium Only 2017 Export Cable Bibby Hydromap's vessel LIA started a Bathymetric ... Subscribers only field Subscribers only field
Freemium Only 2017 Met Mast/LiDAR DONG Energy will be deploying two FLIDAR buoys and... Subscribers only field Subscribers only field
Freemium Only 2016 Export Cable A bathymetric survey using highly sensitive multi-... Subscribers only field Subscribers only field
Freemium Only 2016 Site Investigation The vessel PRINCE MADOG is undertaking an environm... Subscribers only field Subscribers only field
Freemium Only 2016 Environmental and Seabed Monitoring Bibby Hydromap's survey vessel PROTEUS began a geo... Subscribers only field Subscribers only field
Freemium Only 2016 Environmental and Seabed Monitoring The vessel Mersey Guardian carried out a Bird Surv... Subscribers only field Subscribers only field
Freemium Only 2016 Other The vessel FLINTSTONE carryied out scour protectio... Subscribers only field Subscribers only field
Freemium Only 2016 Export Cable The vessel Guardian carried out a multi-beam echo ... Subscribers only field Subscribers only field
Freemium Only 2016 The vessel Mersey Guardian will be on site to cond... Subscribers only field Subscribers only field
Freemium Only 2016 Foundation Divers will inspect 26 turbine positions at the si... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine The vessel Wind Server arrived back on site, after... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine The vessel Wind Server arrived on site to carry ou... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine The vessel Wind Server arrived on site to carry ou... Subscribers only field Subscribers only field
Freemium Only 2015 Turbine The WIND SERVER arrived on-site on this date to pe... Subscribers only field Subscribers only field
Freemium Only 2015 Environmental and Seabed Monitoring A geophysical survey is being undertaken on the ex... Subscribers only field Subscribers only field
Freemium Only 2015 Starting on this date there will be one day of bir... Subscribers only field Subscribers only field
Freemium Only 2015 Met Mast/LiDAR The FLiDAR Buoy was removed from site.... Subscribers only field Subscribers only field
Freemium Only 2015 Turbine A 2 day hydrographic and geophysical survey is tak... Subscribers only field Subscribers only field
Freemium Only 2014 Met Mast/LiDAR The FLiDAR buoy was re-deployed. The FLiDAR is anc... Subscribers only field Subscribers only field
Freemium Only 2014 Fully Commissioned The Secretary of State Ed Davey officially opened ... Subscribers only field Subscribers only field
Freemium Only 2014 Loss of Asset The FLiDAR broke free from the moorings and washed... Subscribers only field Subscribers only field
Freemium Only 2014 Export Cable Installation Commissioning of the export cables was underway an... Subscribers only field Subscribers only field
Freemium Only 2014 Met Mast/LiDAR A FLiDAR was installed at the site.... Subscribers only field Subscribers only field
Freemium Only 2014 Export Cable Installation Following completion of works to the northerly exp... Subscribers only field Subscribers only field
Freemium Only 2014 Met Mast/LiDAR A FLiDAR floating device will be sited near the me... Subscribers only field Subscribers only field
Freemium Only 2014 Met Mast/LiDAR Geosea vessel INNOVATION installed a performance m... Subscribers only field Subscribers only field
Freemium Only 2014 Export Cable Installation Repairs to the export cable in the Lune Deep Area ... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation SEA INSTALLER completed installation of the last t... Subscribers only field Subscribers only field
Freemium Only 2014 Export Cable Repairs to the export cables were initially schedu... Subscribers only field Subscribers only field
Freemium Only 2014 Environmental and Seabed Monitoring Bird surveys were conducted from this date until 1... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation 92 turbines have completed installation activities... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation 88 turbines were installed.... Subscribers only field Subscribers only field
Freemium Only 2014 Array Cable Installation All of the array cables have been buried and the i... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation 79 turbines have been completed.... Subscribers only field Subscribers only field
Freemium Only 2014 Array Cable Installation All array cables have been laid, 31 cables have be... Subscribers only field Subscribers only field
Freemium Only 2014 Grid Connection Available Additional grid connection of 178MW bringing the t... Subscribers only field Subscribers only field
Freemium Only 2014 Met Mast/LiDAR Two Galion G4000 offshore wind LiDAR were installe... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation Half of the 108 turbines have been installed.... Subscribers only field Subscribers only field
Freemium Only 2014 Other Rocking dumping on two crossings on the export cab... Subscribers only field Subscribers only field
Freemium Only 2014 Generating Power Power was produced from the project for the first ... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation 42 of the turbines were installed at the site.... Subscribers only field Subscribers only field
Freemium Only 2013 Other Construction Update: The Rock Placement Vessel 'SE... Subscribers only field Subscribers only field
Freemium Only 2013 Array Cable Installation Maersk Responder was on site carrying out the tren... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine Installation Installation vessel SEA INSTALLER continued to tra... Subscribers only field Subscribers only field
Freemium Only 2013 Other The foundation grouting will start in May 2013 and... Subscribers only field Subscribers only field
Freemium Only 2013 Array Cable Installation All of the Inter-Array or Infield Cables have been... Subscribers only field Subscribers only field
Freemium Only 2013 Export Cable Installation Installation of the export cables has been complet... Subscribers only field Subscribers only field
Freemium Only 2013 Grid Connection Available Grid entry capacity for first 204 MW available int... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 107 foundations and transition pieces have been in... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation All foundations and transition pieces had been ins... Subscribers only field Subscribers only field
Freemium Only 2013 Other At Dong's 9 month interim financial report this pr... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 105 foundations and transition pieces have been in... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine Installation The first of 108 Siemens 3.6MW turbines was instal... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine Installation Turbine and blade installation began in September ... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine Installation Installation vessel SEA INSTALLER left Belfast por... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 88 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 84 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 82 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 78 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation The last three foundations were loaded at Bladt, A... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 74 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Export Cable Installation The lay and burial of the export started from the ... Subscribers only field Subscribers only field
Freemium Only 2013 Export Cable Installation The Stemat Spirit will arrive and mobilise for lay... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine Installation Installation vessel SEA INSTALLER is currently in ... Subscribers only field Subscribers only field
Freemium Only 2013 Array Cable Installation 54 out of 108 array cables have been laid, and the... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 73 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 68 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation The northern export cable has been laid and buried... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 67 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 64 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 61 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 57 turbine foundations and transition pieces have ... Subscribers only field Subscribers only field
Freemium Only 2013 Array Cable Installation Array cable installation is ongoing, export cable ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 55 foundations and transition pieces have been ins... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation On the 27th of July over half of the foundations a... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 49 foundations and transition pieces have been ins... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 42 foundations and transition pieces have been ins... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 41 foundations and transition pieces have been ins... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 38 foundations and transition pieces have been ins... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 32 foundations and transition pieces have been ins... Subscribers only field Subscribers only field
Freemium Only 2013 Offshore Substation The installed substation was undergoing cold commi... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation Construction update: 21 of 108 foundations and tra... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation Construction update: 16 turbine foundations and tr... Subscribers only field Subscribers only field
Freemium Only 2013 Array Cable Installation Installation of the array cables started in early ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation The first foundation was installed at location E08... Subscribers only field Subscribers only field
Freemium Only 2013 Offshore Substation The topside of the substation was installed.... Subscribers only field Subscribers only field
Freemium Only 2013 Offshore Substation The substation foundation was installed and the to... Subscribers only field Subscribers only field
Freemium Only 2013 Other The foundation grouting will start in May 2013 and... Subscribers only field Subscribers only field
Freemium Only 2013 Construction - Seabed Preparation Filter layer placement at the turbine locations co... Subscribers only field Subscribers only field
Freemium Only 2013 Export Cable Installation Stemat Spirit also on site for installation of fir... Subscribers only field Subscribers only field
Freemium Only 2013 Construction - Seabed Preparation Pre lay grapnel runs along the 2 export cable rout... Subscribers only field Subscribers only field
Freemium Only 2013 Strategy or Policy Development The longlist of bidders to purchase the transmissi... Subscribers only field Subscribers only field
Freemium Only 2012 Other First load out of 108 monopiles in Aalborg, Denmar... Subscribers only field Subscribers only field
Freemium Only 2011 Geotechnical Site Investigation Geotechnical site investigation of export cable ro... Subscribers only field Subscribers only field
Freemium Only 2011 Financial Close DONG and ScottishPower Renewables have decided to ... Subscribers only field Subscribers only field
Freemium Only 2010 Geotechnical Site Investigation Geotechnical sampling. Jack up Excalibur performed... Subscribers only field Subscribers only field
Freemium Only 2010 Geotechnical Site Investigation Geotechnical site investigation of export cable ro... Subscribers only field Subscribers only field
Freemium Only 2008 Consent Authorised Permission for the wind farm was given by the gove... Subscribers only field Subscribers only field
Freemium Only 2006 Consent Application Submitted The consent application was submitted.... Subscribers only field Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore