Scottish Sectoral Marine Plan - NE1 Floating Wind Farm

01 Oct 2022: The ScotWind Leasing clearing process opened on 26 April 2022. It is currently anticipated to be completed in December 2022 or January 2023. Option Agreement(s) will likely be announced 8 weeks prior to this, i.e. in October. Timetable (from April 2022): Clearing Areas confirmed and eligible Applicants invited to indicate whether they wish to participate in Clearing (no obligation to apply) - April Deadline for eligible Applicants to confirm interest in Clearing - 2 weeks after clearing areas confirmed New portal event opens for eligible Applicants - 5 working days after Applicant confirmation Period for receipt of clarifications from Applicants - From portal event opening until 2 weeks prior to submission deadline Applicants prepare submissions and submit - 8 weeks from portal event opening Application Completeness & Legibility Check by CES - 2 weeks from portal closing Clarifications to Applicants on Completeness & Legibility Check - 3 working days Evaluation of Clearing Applications by CES - 4 weeks Offer Option Agreements - 1 working day Sign Option Agreements - 8 weeks after offer
Location:
United Kingdom
Status:
Dormant
Capacity:
2800 MW
4C Offshore | Location Map: Lat(60.293) Lon(-0.194)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
2800 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
60.293014°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life