10 Oct 2022: SSE and Total Energies applied and submitted for a section 36C from Marine Scotland to vary the existing consent to increase the height and dimensions of Seagreen’s remaining 36 turbines. This has now allowed them to increase the Maximum Capacity from 360MW to 500MW. It has been put forward that it will increase the size of 36 of the consented but not constructed Wind Turbine Generators with a variation in parameters to increase the maximum rotor diameter from 167m to 242m, the maximum blade chord width from 5.4m to 7.6m, the maximum tip height from 209.7m to 285m and finally the maximum hub height from 126.2m to 165m.
Location:
United Kingdom
Status:
Consent Authorised
Capacity:
500 MW
4C Offshore | Location Map: Lat(56.561) Lon(-1.867)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea, Northern North Sea (Forth)
Latitude
56.561125°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life