TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!
17 Apr 2024: Update 17 April 2024: The Secretary of State has granted consent for both extension projects. The consent comes with the conditions that turbines must not: (a) exceed a height of 330 metres when measured from HAT to the tip of the vertical blade; (b) exceed a rotor diameter of 300 metres; (c) be less than 1.05 kilometres from the nearest wind turbine generator in any direction; (d) have a distance of less than 30 metres between the lowest point of the rotating blade of the wind turbine generator and HAT; (e) exceed 23 wind turbine generators in respect of the Sheringham Shoal Extension Project offshore works; or (f) exceed 30 wind turbine generators in respect of the Dudgeon Extension Project offshore works. The developer is required to agree upon a skills and employment plan with Norfolk County Council. Update January 2024: The Secretary of State has set a new deadline for the the decision on this application. The new deadline is 17th April 2024 Update Feb 2023: The Deadline for close of examination is set as 17th July 2023. The deadline for a decision should be 6-months after this, i.e. 17th Jan 2024. However, increasingly the timescales are being extended. Given project submitted a DCO application in September 2022 then a decision could be possible by Q1-2024. (1 month acceptance, 3 months pre-examination, six months examination, 3 months recommendation, 3 months decision). For complex projects, which are becoming increasingly common in the Southern North Sea, expect additional delays.
Location:
United Kingdom
Status:
Consent Authorised
Capacity:
402 MW
4C Offshore | Location Map: Lat(53.279) Lon(1.374)

Subscribers can track wind farms on their dashboard.

General Information
Name
Dudgeon Extension
Other Names
DEP
Country
United Kingdom
Development Status
Consent Authorised
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Equinor ASA (previously Statoil ASA)

Equinor ASA (previously Statoil ASA)

Owner

China Resources (Holdings) Company Limited.华润电力

China Resources (Holdings) Company Limited.华润电力

Owner

Equinor ASA (previously Statoil ASA)

Equinor ASA (previously Statoil ASA)

Owner

Masdar

Masdar


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
402 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
53.278822°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
3
Average Length per Cable
Comments
Expected Life