Atlantic Shores 1 Offshore Wind Farm

19 May 2023: Update (15th May 2023): BOEM has released the draft Environmental Impact Study for Atlantic Shores South. The notice of availability will publish in the Federal Register on 19th May 2023. At this stage, a 45 day public consultation period will commence, ending at 11:59 p.m on 3rd July 2023. There will be two in-person public meetings on 21st and 22nd June 2023 and two virtual public meetings on 26th and 28th June 2023. Update (April 2022): BOEM is undertaking a comprehensive review of the permitting timetable for this project with the cooperating agencies and project sponsor. The review encompasses all NEPA and associated agency actions and milestone dates for the project, including this action. The review is expected to be completed in early May 2023, which will result in coordination with the FPISC Executive Director. Previous: BOEM plans to publish a draft EIS in the Federal Register for consultation. This is based on the COP and feedback will inform the final EIS, which will inform the consent decision. The previous target for this was 2nd December 2022 but now it is 5th May 2023.
Location:
United States
Status:
Consent Application Submitted
Capacity:
1509.6 MW
4C Offshore | Location Map: Lat(39.259) Lon(-74.123)

Subscribers can track wind farms on their dashboard.

General Information
Name
Atlantic Shores 1
Other Names
Lease OCS-A 0499; Atlantic Shores South
Country
United States
Development Status
Consent Application Submitted
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Atlantic Shores Offshore Wind, LLC

Atlantic Shores Offshore Wind, LLC

Owner

EDF Renewables USA

EDF Renewables USA

Owner

Shell New Energies US LLC

Shell New Energies US LLC


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
USD 106.18/MWh (EUR 92.98/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
1509.6 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Atlantic Ocean
Latitude
39.2595°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life