4C Offshore Empowering Intelligence

Tillamook - phase 2 Floating Wind Farm

30 Apr 2017: In  2008  Principle  Power  submitted  a  non‐solicited  proposal  to  the  TIDE  Hydrokinetic  Energy  Project RFP.   At  the  time,  the  request  for  proposals  did  not include  offshore wind  developments,  but  nevertheless,  TIDE  contacted  Principle  Power  for  more  information  about the WindFloat (previously called “MFWind”) technology and proposed development.  Following  this request, some interviews, and subsequent discussions, Principle Power and  TIDE  signed  a  Memorandum  of  Agreement  for  the  phased  development  of  a  150  MW  floating offshore wind power plant off the coast of Tillamook County, Oregon. The terms of  the MOA called for TIDE support in outreach activities hosted by Principle Power at public  meetings and  roundtable  discussions with  state,  federal, and local  stakeholders as well as  environmental  agencies,  fishermen's  associations  (such  as  the  Fishermen’s  Advisory  Committee  for  Tillamook  (“FACT”)),  and  commercial  and  recreational  marine  users  to  ensure that all stakeholder interests are considered.  Shortly  thereafter,  Principle  Power  and  Tillamook  PUD  also  signed  a  Memorandum  of  Agreement  for  the  same  phased  development. The  terms  of  the MOA  called  for Tillamook  PUD  and  Principle  Power  to  enter  into  good  faith  discussions  regarding  plant  location,  energy output and safe interconnection to the grid.  The utility and Principle Power agreed  that  they  could execute  separate Agreements  for  plant  ownership,  permitting,  community  outreach, environmental, energy production, grid‐interconnection, installation, deployment,  operations, maintenance, and/or other contracts and services as needed.
Location:
United States
Status:
Dormant
Capacity:
140 MW
4C Offshore | Location Map: Lat(45.381) Lon(-124.387)

Subscribers can track wind farms on their dashboard.

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
140 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Pacific Ocean
Latitude
45.380926°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life