4C Offshore Empowering Intelligence
13 Sep 2023: Update (13th September 2023): The turbine installation campaign has now begun. The ribbon cutting on the first turbine, scheduled for Friday 15th September 2023, has been postponed due to an expected hurricane. Update (7th September 2023): The first GE Haliade-X turbine components have been sailed out of the Port of New Bedford, ready to be installed on site. According to AIS data, the vessel Sea Installer is now on site to commence operations. Expect the first turbine to be installed over the coming days. Update (31st August 2023): Installation vessel Sea Installer will begin turbine installation works in September. Installation works will begin at position where both monopile foundations and transition pieces have been installed. Works are estimated to continue until early December 2023 Update (14th August 2023): The turbine installation vessel is on site. Update (July 2023): Assume further delay to 14th August 2023 as the vessel Sea Installer is still in Rotterdam. Update (May 2023): Turbine installation is scheduled to take place from 15th June 2023 to 31st May 2024. Assume some time first to install the first six monopiles (was to start mid-May but now to start end-May). Update (January 2021): Vineyard Wind is now targeting mid-2023 turbine installation start. Scheduled to start in June 2023. Installation of Haliade-X 13 MW  turbines was scheduled for 2021. New schedule following permitting delay is unclear.
Location:
United States
Status:
Under Construction
Capacity:
804 MW
4C Offshore | Location Map: Lat(41.053) Lon(-70.471)

Subscribers can track wind farms on their dashboard.

General Information
Name
Vineyard Wind 1
Other Names
Lease OCS-A 0501 North
Country
United States
Development Status
Under Construction
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Vineyard Wind, LLC(formerly OffshoreMW)

Vineyard Wind, LLC(formerly OffshoreMW)

Developer

Vineyard Wind, LLC(formerly OffshoreMW)

Vineyard Wind, LLC(formerly OffshoreMW)

Operator

Vineyard Wind, LLC(formerly OffshoreMW)

Vineyard Wind, LLC(formerly OffshoreMW)

Owner

Copenhagen Infrastructure Partners

Copenhagen Infrastructure Partners

Owner

Avangrid Renewables, LLC

Avangrid Renewables, LLC


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
USD 84.23/MWh (EUR 73.76/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
804 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Atlantic Ocean
Latitude
41.053362°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
2
Average Length per Cable
Comments
Expected Life