Phu Cuong 1 Offshore Wind Farm

30 Jun 2022: Update (January 2022): If FID is achieved early on in 2022, construction of 1A may begin as scheduled in Q2 2022. Update (March 2021): MRP is communicating a construction start in Q4 2021. Update (August 2020): MRP is communicating a construction start in Q2 2021. Construction was previously expected to start late 2018/early 2019 (June 2017). In June 2019, a revised timeline was presented, indicating construction of Phase 1A would begin in Q2 2020, following financial close the same quarter.
Location:
Vietnam
Status:
Consent Authorised
Capacity:
400 MW
4C Offshore | Location Map: Lat(9.191) Lon(105.928)

Subscribers can track wind farms on their dashboard.

General Information
Name
Phu Cuong 1
Other Names
Nhà máy điện gió Phú Cường 1 - Sóc Trăng; Nhà Máy Phong Điện Phú Cường 1; Điện gió Phú Cường 1
Country
Vietnam
Development Status
Consent Authorised
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation
Developer

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
400 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
South China Sea
Latitude
9.190654°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life