Latest event on Amrumbank West

CWind has undertaken inspections of the monopiles, scour protection and cables at a number of locations at the wind farm. CWind used its V8 Ocean Modules Inspection Class ROV. Read more

Latest Update: 05 December 2016

You can help keep this an open resource by submitting new information. Simply click on the correct pencil icon.
Developers/Owners/Operators Database in Excel | Add your Organisation
Project Details for Amrumbank West
General Information Name Amrumbank West correct
Other names correct
Country name Germany correct
Region Exclusive Economic Zone 1 (HelWin) (BSH Cluster 4 in Draft Network Plan) correct
Comments Project generation was initially delayed by availability of Tennet connection (Helwin 2). correct
Round (or category) correct
Development status Fully Commissioned correct
Power & Turbines Project capacity 302 MW correct
Turbine model SWT-3.6-120 (Siemens) correct
Turbine capacity 3.6 MW correct
Number of turbines 80 correct
Total turbine height 150 m correct
Hub height 90.00 m correct
Rotor diameter 120 m correct
Foundation Grounded: Monopile correct
Windspeed 10 year mean wind speed (2000-2009) Available online now
Costs Stated project cost EUR(mill) 1000.00 correct
Location & Environment Sea name North Sea correct
Centre latitude 54.523° correct
Centre longitude 7.705° correct
Area 33 km2 correct
Depth range (Chart Datum) 20 m - 25 m correct
Depth range stated by developer 21 m - 25 m correct
Distance from shore (reported) 35 km correct
Distance from shore (computed from centre) 45 km correct
Ports Installation base Esbjerg (DK) for turbines, Hoboken (BE) for substation, Cuxhaven(DE) for foundations correct
Ops and maintenance Helgoland correct
Grid Converter/Collector platforms HelWin2 Converter correct
Offshore transformers Amrumbank West Substation correct
Grid connection point Helwin2 (beta) converter station (offshore) - Büttel onshore substation correct
Cable landing point Büsum correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of export cables 2 correct
Average length per cable 8 km correct
Transmission type (e.g. HVAC) correct
Nominal voltage 155 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type correct
Section area 400 mm2 correct
Insulation correct
Number fibre optics 30 correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length 86 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type correct
Section 240/500 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments 86 cables connected the 80 turbines. correct
Benefits Homes powered annually 213893 correct
CO2 reduced per year 432278 tonnes correct
SO2 reduced per year 10053 tonnes correct
Expected life correct
Other Website Visit correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
1234
StatusName
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Hohe See Hohe See
Under Construction Merkur Merkur
Under Construction OWP Albatros OWP Albatros
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Pre-Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Baltic Eagle Baltic Eagle
Consent Authorised Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Kaskasi Kaskasi
Consent Authorised OWP West OWP West
Consent Authorised Wikinger Süd Wikinger Süd
Consent Application Submitted Gennaker Gennaker
Concept/Early Planning GICON® SOF 6-8MW Test Turbine GICON® SOF 6-8MW Test Turbine
Concept/Early Planning ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity) ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity)
Development Zone Darß - priority area for wind energy Darß - priority area for wind energy
Development Zone German Central Tender 2022 (Assumed North Sea) German Central Tender 2022 (Assumed North Sea)
Development Zone German Central Tender 2023 (Assumed Baltic Sea) German Central Tender 2023 (Assumed Baltic Sea)
Development Zone German Central Tender 2024 (Assumed North Sea) German Central Tender 2024 (Assumed North Sea)
Development Zone German Central Tender 2025 (Assumed North Sea) German Central Tender 2025 (Assumed North Sea)
Development Zone German Central Tender 2026 (Assumed North Sea) German Central Tender 2026 (Assumed North Sea)
1234
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=de05.