TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

French floating project components arrive at Marseille Fos

4C Offshore | Tom Russell
By: Tom Russell 26/08/2021 The port of Marseille Fos
Components which will form part of the foundation for the Provence Grand Large floating offshore wind farm foundations have arrived at the Eiffage Métal yard at the Port of Marseille Fos. Three or four shipments should follow by the end of the year to prepare for the installation of the floating offshore wind farm.

The
Provence Grand Large floating offshore wind project will be built off the Mediterranean coast in 2022. The project is located approximately 40 km west from Marseille, at the entry of the Gulf of Fos, 16 km from the Napoleon beach car park, at Port Saint Louis du Rhône. It is being developed by EDF Energies Nouvelles with project partners Enbridge and Réseau de Transport d'Electricité (RTE)

It will feature three Siemens-Gamesa 8.4 MW wind turbines mounted on SBM Offshore floating foundations. The project will then be connected to the public electricity transmission grid via a 19 km submarine cable and a 9 km underground cable by RTE.


For more information on floating offshore wind farms worldwide, click here.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!