TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Renexia celebrates full commissioning for first Mediterranean wind farm

4C Offshore | Tom Russell
By: Tom Russell 13/05/2022 4C Offshore

Renexia has celebrated the full commissioning and operational start of the first offshore wind farm in the Mediterranean. The Beleolico (also named
Taranto) project is located near the Port of Taranto, in the region of Puglia, in the south-east of Italy.

It features ten MySE3.0-135 turbines from MingYang, each with a 3 MW capacity. They were installed by Van Oord using its  offshore installation vessel
MPI Resolution and are the first commercial Chinese turbines in European waters. MingYang is also set to deliver a 25-year full operations and maintenance service contract.

Renexia acquired the 30 MW
offshore wind project from Luxembourg based Belex Holding in mid-2018. It is anticipated that it will produce 58,200 MWh per year, enough to power 21,000 homes.

The project obtained a feed-in-tariff (FiT) of €161.70/MWh back in 2016, although the plant is entitled to add an additional €40/MWh, having built the electrical connection itself.

For more information on offshore wind farms worldwide,
click here. Alternatively, you can view projects across the globe using 4C Offshore's Interactive Map.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!