TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Edda Mistral

W2W

4C Offshore | Edda Mistral
Edda Mistral is a sister vessel of the SOV ordered by Orsted Energy to work on Race Bank. Orsted declared the option for the second vessel from the original contract and utilised for the Hornsea Project One wind farm. The vessel was delivered on schedule in Q3 2018. The vessel has a daughter craft (11m and 10 pax) and on FRC with seven passenger capacity.

The power management system results in the vessel using 20% less fuel than in a standard system.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
General Information
Name
Edda Mistral
Other Names
Østensjø Rederi tbn (Hornsea Project One) DONG SOV 2 C471
Operator
Unlock with a freemium account
Vessel Category
Unlock with a freemium account
Vessel Classification
Maximum Endurance
Has Heli Deck?
Flag

Build Information
Construction Country
Shipyard

Main Characteristics
Length Overall (LOA)
Maximum Draft
Passengers

Speed
Transit Speed
Maximum Speed

Cargo Deck
Free Deck Space
Deadweight

Vessel Identification
Call Sign
IMO Number
MMSI

Positioning
Dynamic Positioning (DP) Class
DP Notes

Links
Operator Website
Vessel Spec.

Edda Mistral has built up the following project/contract experience:

Experience on Wind farm(s)

Experience on Interconnector(s)

No previous experience recorded.

Experience on Converter(s)

No previous experience recorded.