4C Offshore Empowering Intelligence
26 Sep 2023: The Crown Estate (TCE) mature the design of leasing Round 5 further in response to industry feedback: The minded-to position in July proposed to offer the market four Project Development Areas (sites, or PDAs). Following feedback, TCE has adapted the spatial offer to three PDAs within the same seabed area, each of which has an enhanced potential capacity of up to 1.5GW. Where previously there was scope to allow a single bidder to win two PDAs, under the revised structure, each bidder will be permitted to win one PDA. Reasons for the change: - The uncertainty in this emerging market around foundation, anchoring and mooring solutions and optimal array layouts. - The potential impact of telecommunications cables within the PDAs. - The cumulative impacts of closely located projects on the environment and on other sectors like civil navigation. - The potential implications of the proximity of the PDAs on wake effects and on other users of the seabed. - Based on feedback on the need for greater spatial flexibility given technical constraints, TCE has revised its minded-to position set out in July What has changed and what hasn't : - The outer boundary of the area containing the PDAs remains unchanged, as do the key minded-to technical parameters like separation distances between adjacent projects.  - Round 5 will bring to market three larger PDAs, rather than four PDAs. - Up to 1.5GW could be feasible in each new PDA, providing up to 4.5GW in total, instead of the previously expected 4GW. - Each PDA will have one winner. - Development of each PDA may occur in multiple projects or phases of at least 300MW as previously advised (up to a maximum of three projects or phases).
Location:
United Kingdom
Status:
Development Zone
Capacity:
1500 MW
4C Offshore | Location Map: Lat(51.328) Lon(-5.642)

Subscribers can track wind farms on their dashboard.

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
1500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Celtic Sea
Latitude
51.327793°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life