Developers/Owners/Operators (4)

RoleOrganisation 
Developer
Nordsee One GmbH
Nordsee One GmbH is a company set up to develop the 332 MW Norsdee One offshore wind farm project, and is owned by Northland Power Inc. (NPI) and RWE Innogy GmbH.
correct
Operator
Nordsee One GmbH
Nordsee One GmbH is a company set up to develop the 332 MW Norsdee One offshore wind farm project, and is owned by Northland Power Inc. (NPI) and RWE Innogy GmbH.
correct
Owner correct
Owner correct

Turbines (4)

Substations (6)

RoleOrganisation 
Designer-Substation
Design of substation and foundation
correct
Designer-Substation
Semco are assisting Bladt Industries with the design of the substation.
correct
Designer-Substation-Topside correct
Main Contractor-Substation correct
Maintenance-Substation correct
Manufacturer-Substation correct

Foundations (13)

RoleOrganisation 
Designer(Detailed)-Foundation(Substation) correct
Designer(Detailed)-Foundation(Turbine)
Ambau GmbH
Client: LogIn
AMBAU GmbH to design and produce monopiles and transition pieces
Number of turbines: LogIn
correct
Designer-Foundation(turbine) correct
Installer-Foundation(substation) correct
Installer-Foundation(turbine) correct
Installer-Transition Piece(turbine) correct
Manufacturer-Foundation(substation) correct
Manufacturer-Foundation(turbine)
Ambau GmbH
Client: LogIn
AMBAU GmbH to design and produce monopiles and transition pieces
Number of foundations: LogIn
correct
Manufacturer-Foundation-Primary Steel(turbine)
Ambau GmbH
Client: LogIn
AMBAU GmbH to fabricate monopiles
Number of foundations: LogIn
correct
Manufacturer-Foundation-Primary Steel(turbine) correct
Manufacturer-Transition Piece(turbine)
Ambau GmbH
Client: LogIn
AMBAU GmbH to design and produce monopiles and transition pieces
Number of transition pieces: LogIn
correct
Manufacturer-Transition Piece-Primary Steel(turbine)
Ambau GmbH
Client: LogIn
AMBAU GmbH fabricate transition pieces
Number of transition pieces: LogIn
correct
Manufacturer-Transition Piece-Secondary Steel(turbine)
Ambau GmbH
Client: LogIn
AMBAU GmbH add additional steel and finish transition pieces
Number of transition pieces: LogIn
correct

Array Cabling (3)

RoleOrganisation 
Installer-Array Cabling correct
Main Contractor-Array Cabling correct
Manufacturer-Array Cabling correct

Export Cabling (3)

RoleOrganisation 
Installer-Export Cabling correct
Main Contractor-Export Cabling correct
Manufacturer-Export Cabling
J-Power Systems Corporation (株式会社ジェイ・パワーシステムズ) (Sumitomo Corporation)
Client: LogIn
correct

Met Masts (0)

Consultants (11)

RoleOrganisation 
Consultant-Certification correct
Consultant-Certification correct
Consultant-Certification
Tuv Sud
Client: LogIn
correct
Consultant-Financial correct
Consultant-Health & Safety
Staatliches Gewerbeaufsichtsamt Oldenburg acted as the supervisory authority for the health and safety of the project. Offshore wind farms in the EEZ were assigned to the department in the year 2009 by the ministry of social affairs of lower saxony.
correct
Consultant-Health & Safety
PMSS - See TÜV SÜD PMSS (Tuv Sud)
correct
Consultant-Other correct
Consultant-Other correct
Consultant-Other
DHI Group
Client: LogIn
correct
Consultant-Shipping and Navigation correct
Consultant-Weather Forecasting
Met Office
Client: LogIn
correct

Others (27)

RoleOrganisation 
Contractor-Other correct
Contractor-Other correct
Designer-Other
MME Group
Client: LogIn
The design and engineering (in-house FEM Analysis) of the cathodic protection for all monopiles of OWF Nordsee One. This is a combined ICCP system for the in- and external sides of the foundations. The work Started in September 2015 and ended in February 2016.
correct
Engineer-Geotechnical correct
Installer-Scour Protection correct
Investor correct
Investor correct
Investor correct
Investor correct
Investor correct
Investor correct
Investor correct
Investor
Commerzbank AG
correct
Investor
Helaba
correct
Investor correct
Investor
Bank of Tokyo-Mitsubishi UFJ
correct
Supplier-Helicopter
HTM has been supporting O&M services and the hoisting of service teams to the turbines since January 2018.
correct
Supplier-Other
Supply of containerized emergency generating set 400kVA and two main generating sets each 1875 kVA, constructed for an inrush of 20kA. From March 2015.
correct
Supplier-Other
Planning, design, production and commissioning of a complete power quality monitoring and fiscal metering system for the OSS. The scope includes metering and communication equipment, cabinets and readout software and project management from the kick off meeting until the final commissioning offshore. Between 2015/2016.
correct
Supplier-Other
NT Offshore
Client: LogIn
correct
Supplier-Other
Nordsee One GmbH chose SeaPlanner for its marine management system during the projects operational phase as well as its Permit to Work system which was launched in December 2017. .
In September 2015 Nordsee One selected the SeaPlanner marine management system when it began construction for vessel tracking, personnel tracking and the provision of a comprehensive communications survey.
correct
Supplier-Other correct
Supplier-Other
SeaPlanner Ltd (Searoc UK LTD)
Client: LogIn
correct
Surveyor-Geophysical correct
Surveyor-Geotechnical correct
Surveyor-Other correct
Transport-Other correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
1234
StatusName
Decommissioned Hooksiel Hooksiel
Fully Commissioned Alpha Ventus Alpha Ventus
Fully Commissioned Amrumbank West Amrumbank West
Fully Commissioned BARD Offshore 1 BARD Offshore 1
Fully Commissioned Borkum Riffgrund 1 Borkum Riffgrund 1
Fully Commissioned Breitling Breitling
Fully Commissioned Butendiek Butendiek
Fully Commissioned DanTysk DanTysk
Fully Commissioned EnBW Baltic 1 EnBW Baltic 1
Fully Commissioned EnBW Baltic 2 EnBW Baltic 2
Fully Commissioned ENOVA Offshore Project Ems Emden ENOVA Offshore Project Ems Emden
Fully Commissioned Global Tech I Global Tech I
Fully Commissioned Gode Wind 1 and 2 Gode Wind 1 and 2
Fully Commissioned Meerwind Süd/Ost Meerwind Süd/Ost
Fully Commissioned Nordergründe Nordergründe
Fully Commissioned Nordsee One Nordsee One
Fully Commissioned Nordsee Ost Nordsee Ost
Fully Commissioned Riffgat Riffgat
Fully Commissioned Sandbank Sandbank
Fully Commissioned Trianel Windpark Borkum I Trianel Windpark Borkum I
Fully Commissioned Veja Mate Veja Mate
Fully Commissioned Wikinger Wikinger
Partial Generation/Under Construction Merkur Merkur
Under Construction Arkona Arkona
Under Construction Borkum Riffgrund 2 Borkum Riffgrund 2
Under Construction Hohe See Hohe See
Under Construction OWP Albatros OWP Albatros
Pre-Construction Deutsche Bucht Deutsche Bucht
Pre-Construction GICON Schwimmendes Offshore Fundament (SOF) Pilot GICON Schwimmendes Offshore Fundament (SOF) Pilot
Pre-Construction Trianel Windpark Borkum II Trianel Windpark Borkum II
Consent Authorised Arcadis Ost 1 Arcadis Ost 1
Consent Authorised Baltic Eagle Baltic Eagle
Consent Authorised Borkum Riffgrund West 2 Borkum Riffgrund West 2
Consent Authorised Borkum Riffgrund West I Borkum Riffgrund West I
Consent Authorised Deutsche Bucht Pilot Park Deutsche Bucht Pilot Park
Consent Authorised EnBW He Dreiht EnBW He Dreiht
Consent Authorised Gode Wind 3 Gode Wind 3
Consent Authorised Gode Wind 4 Gode Wind 4
Consent Authorised Kaskasi Kaskasi
Consent Authorised OWP West OWP West
Consent Authorised Wikinger Süd Wikinger Süd
Consent Application Submitted Gennaker Gennaker
Concept/Early Planning GICON® SOF 6-8MW Test Turbine GICON® SOF 6-8MW Test Turbine
Concept/Early Planning ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity) ReaLCoE (Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity)
Development Zone Darß - priority area for wind energy Darß - priority area for wind energy
Development Zone German Central Tender 2022 (Assumed North Sea) German Central Tender 2022 (Assumed North Sea)
Development Zone German Central Tender 2023 (Assumed Baltic Sea) German Central Tender 2023 (Assumed Baltic Sea)
Development Zone German Central Tender 2024 (Assumed North Sea) German Central Tender 2024 (Assumed North Sea)
Development Zone German Central Tender 2025 (Assumed North Sea) German Central Tender 2025 (Assumed North Sea)
Development Zone German Central Tender 2026 (Assumed North Sea) German Central Tender 2026 (Assumed North Sea)
1234
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=de28.