Horns Rev 2 Offshore Wind Farm

01 Jan 2021: On 16th March Danfoss and Ørsted announced signing a 10-year fixed price corporate power purchase agreement for 27 MW of the capacity of Horns Rev 2 Offshore Wind Farm. This is Ørsted's first CPPA for a wind farm out of subsidy, which ended in October 2020. According to Danfoss, the CPPA was in place from January 2021, and will enable carbon-neutral electricity for all locations in Denmark and Germany, delivering 116 GWh electricity annually. This corresponds to 25% of the group’s total electricity consumption,and will reduce Danfoss’ global CO2 emissions by an estimated 30,000 tons.
Location:
Denmark
Status:
Fully Commissioned
Capacity:
209.3 MW
4C Offshore | Location Map: Lat(55.600) Lon(7.583)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
209.3 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
55.60042°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
3
Average Length per Cable
Comments
Expected Life