Germany 110.7MW Fully Commissioned

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Events overview for Nordergründe

Event Date Event Type Event Description Event Source
Subscribers only field Subscribers only field Subscribers only field Subscribers only field
Freemium Only 2019 Onshore Substation Tennet have announced a planned period of unavaila... Subscribers only field Subscribers only field
Freemium Only 2019 Onshore Substation TenneT completed a short period of unavailability ... Subscribers only field Subscribers only field
Freemium Only 2018 NKT announced that it has successfully commissione... Subscribers only field Subscribers only field
Freemium Only 2017 Fully Commissioned The last turbine was connected to the grid.... Subscribers only field Subscribers only field
Freemium Only 2017 Generating Power Tennet announces that Nordergründes grid is connec... Subscribers only field Subscribers only field
Freemium Only 2017 Offshore Substation WPD successfully completed installation of the off... Subscribers only field Subscribers only field
Freemium Only 2017 Production and Procurement The substation has been shipped from the construct... Subscribers only field Subscribers only field
Freemium Only 2017 Other MO 4 crew transfer vessel to work on site as part ... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation The last turbine was installed. wpd is in talks th... Subscribers only field Subscribers only field
Freemium Only 2016 Array Cable Installation The cable installation barge Nostag 10 left the si... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation The MPI Enterprise installed two more turbines on ... Subscribers only field Subscribers only field
Freemium Only 2016 The President of the District Court of Bremerhaven... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation By this date eight turbines had been installed by ... Subscribers only field Subscribers only field
Freemium Only 2016 Ownership Change wpd announced that it has sold a 30% stake in the ... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation The first Senvion 6.2M126 turbine at the wind farm... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation MPI Enterprise arrived back on site to install the... Subscribers only field Subscribers only field
Freemium Only 2016 Production and Procurement By this date the first 9 of 18 nacelles from Senvi... Subscribers only field Subscribers only field
Freemium Only 2016 Foundation Installation The jack up vessel MPI Enterprise installed the la... Subscribers only field Subscribers only field
Freemium Only 2016 Foundation Installation By this date 14 of the 18 foundations have been in... Subscribers only field Subscribers only field
Freemium Only 2016 Array Cable Installation The cable installation barge Nostag 10 arrived on ... Subscribers only field Subscribers only field
Freemium Only 2016 Export Cable Installation The vessel Stemat 82 arrived at the project site w... Subscribers only field Subscribers only field
Freemium Only 2016 Grid Connection Available According to the 2014 draft of the Offshore-Netzen... Subscribers only field Subscribers only field
Freemium Only 2016 Export Cable Installation Installation of TenneT's 28km 155kV export cable b... Subscribers only field Subscribers only field
Freemium Only 2016 Foundation Installation MPI Enterprise arrived on site to begin foundation... Subscribers only field Subscribers only field
Freemium Only 2016 Export Cable Installation The Stemat 82 arrived at the substation site with ... Subscribers only field Subscribers only field
Freemium Only 2016 Export Cable Installation The vessel Stemat 82 arrived at Hooksiel to begin ... Subscribers only field Subscribers only field
Freemium Only 2015 Production and Procurement Ambau started fabricating the tower sections.... Subscribers only field Subscribers only field
Freemium Only 2015 Financial Close WPD and the KfW IPEX Bank secured the financing of... Subscribers only field Subscribers only field
Freemium Only 2012 Other Approval TenneT receive permission to proceed with export c... Subscribers only field Subscribers only field
Freemium Only 2012 Grid Connection Agreed TenneT offer an unconditional grid connection.... Subscribers only field Subscribers only field
Freemium Only 2011 Other Approval Consent authorised with 6.15MW turbines.... Subscribers only field Subscribers only field
Freemium Only 2008 Consent Authorised Approval for construction and operation of wind fa... Subscribers only field Subscribers only field
Freemium Only 2006 Consent Application Submitted Consent application submitted.... Subscribers only field Subscribers only field