Brindisi Offshore 2.0 Floating Wind Farm

17 Feb 2022: An application and subsequent integration was submitted on 17 February 2022 by the company TG Energie Rinnovabili Srl for the issue of a thirty-year state-owned maritime concession for the following areas: - Water mirror beyond the limit of territorial waters: 101,855,986.86 m²; - Water mirror within the limit of territorial waters: 583,296 m²; - Land-based maritime state area: 260 m². The application was for the installation and operation of a floating-type plant for the production of electricity from renewable offshore wind sources, called "Brindisi offshore2.0. " composed of 95 wind turbines with a total power of 1425 MW to be built beyond 12 nautical miles from the coast. This application is part of the Single Authorization Procedure for the construction and operation of an offshore energy production plant through the exploitation of the wind in the southern Adriatic Sea, in the stretch of sea under the responsibility of the Brindisi Port Authority in front of the towns of Torre Cavallo and Cerano of the Municipality of Brindisi. Main works planned: • 95 wind turbines with a unitary power of 15 MW, for a total power of 1,425 MW, installed on tubular steel towers and the related floating foundations divided into 19 subfields; • electric lines in submarine cable for connection between the wind turbines and the electricity collection and off-shore transformation station, with all the necessary voltage transformation and sectioning devices; • an Off-Shore Electric Station (66/380 kV) (SE), i.e. all the electrical equipment (switches, disconnectors, CTs, VTs, etc.) necessary to collect the energy produced in the wind subfields, raising the voltage from 66 kV at 380 kV; • an HVAC connection power line, consisting of a first section of 380 kV marine cable laid after the transition from marine to terrestrial at the landing point identified at the Enel power station in Brindisi in the "Lido Cerano" area, to connect the plant to the National Transmission Grid (NTG) assumed with connection to the antenna at the Terna electricity station in Brindisi Sud.
Location:
Italy
Status:
Concept/Early Planning
Capacity:
1425 MW
4C Offshore | Location Map: Lat(40.732) Lon(18.124)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1425 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Adriatic Sea
Latitude
40.73224°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life