25 May 2022: Investigation aimed at obtaining the release, for the duration of 30 (thirty) years, of a maritime state concession for the construction and operation of a floating off-shore wind power plant in the sea area in front of the south west coast of Sardinia by the company Thalassa Wind Srl. In particular, the concession relates to the occupation of: - 328.79 m² of state-owned area (ZD) (fig. 3, part. 2165 of the Municipality of Portoscuso (SU)) for the construction of the sections of submarine ducts that fall within the state-owned area, of the junction tank and of the subsequent land duct, which extends to the exit from the state-owned area and from here to the existing TERNA 220 kV “PORTOSCUSO” electricity station; - 197,993.98 m² of stretch of water (SP) in the territorial sea for the positioning of submarine export conduits, from the state-owned area of ​​Portoscuso to the limit of territorial waters in the southwest of Sardinia; - 1,577,275.19 m² of water surface (SP) beyond the border of the territorial sea: for the continuation of the submarine export conduits (20,127.14 m²), for the 2 offshore electrical stations (13,122 m²) and for the installation of n. 35 wind turbines with floating foundation (1,544,026.05 m²).
Location:
Italy
Status:
Concept/Early Planning
Capacity:
525 MW
4C Offshore | Location Map: Lat(38.531) Lon(8.561)

Subscribers can track wind farms on their dashboard.

General Information
Name
Thalassa
Other Names
Thalassa Wind; Parco Eolico Galleggiante “Thalassa” sito nel Mare di Sardegna
Country
Italy
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Thalassa Wind srl

Thalassa Wind srl

Owner

Thalassa Wind srl

Thalassa Wind srl


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
525 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Mediterranean Sea Western Basin
Latitude
38.531104°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life