01 Jan 2023: Update October 2022: The NGI - Norwegian Geotechnical Institute won the contract to develop an integrated ground model as part of a bid for geotechnical soil investigations. Geotechnical studies are expected to start in 2023. Update April 2022: In the first half of March, tender for assessing geophysical and geotechnical aspects such as the morphology of the seabed, morphodynamics and scouring of the wind farm zone will be launched. The study is scheduled to commence in June 2022 The archaeological assessment of the geophysical survey results has been published. A report on the geophysical survey itself will be published soon. In September, the offshore geotechnical campaign at IJmuiden was successfully completed. Reporting is ongoing and the gathered soil samples are currently being tested as part of the extensive laboratory testing programme. Results for the first half of the IJmuiden Ver Investigation Area are due to be published in 2022, while the results of the entire area will be published in 2023.
Location:
Netherlands
Status:
Development Zone
Capacity:
1000 MW
4C Offshore | Location Map: Lat(53.000) Lon(3.795)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
53.000176°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life