Greater Changhua 1 - South East Offshore Wind Farm

25 Apr 2024: Update April 2024: Ørsted announced that all turbines have now been connected and are generating electricity. Great Changhua 1&2a fully commissioned. Update Feb 2024: Ørsted report that the project will reach COD by end Q1 2024. A vessel has been secured for the last four turbines. Update Dec 2023: Ørsted claims that the completion of the 900 MW Greater Changhua 1&2a offshore wind project in Taiwan Province of China will be delayed until 2024 due to supply chain constraints.Its remaining turbines will be installed and commissioned in the first quarter of 2024. Update November 2023: Due to delays in cable laying operations the project is not expected to be fully commissioned until September 2024. Update August 2023:This project is not yet fully connected to the grid, and expects to be fully commissioned by the end of 2023. Update August 2022: Orsted announced that it no longer expects to complete the installation of 111 turbines across Greater Changhua 1 and 2a in 2022, and that the projects are expected to come online during 2023. Update 18th March 2021; Orsted announced that "Ørsted kicks off offshore installation of Greater Changhua 1 & 2a Offshore Wind Farms".  Ørsted will begin laying export and array cables and installing the offshore substations and foundations in 2021 and will proceed with wind turbine installation next year and plan to complete construction the wind farm during 2022. In the Orsted's Q1 2022 Interim report , it says 'In 2022, we expect to complete Hornsea 2 (1,386MW) in the UK and Greater Changhua 1 & 2a (900MW) in Taiwan'. Meanwhile, on page 15 of another doc 'Q120 presentation' from Orsted, it says 'Offshore wind build-out plan: Greater Changhua 1&2a in 2025 & Greater Changhua 2b&4 in 2025'. 16 AUG 2019, Ørsted stated that fully commissioned in 2022, considering the Taipower grid connection work (connect wind farms to central grid) will finish by the end of 2021; Keppel is building two offshore wind farm substations to be deployed across the Greater Changhua projects. Keppel's work scope is scheduled for completion in the third quarter of 2021. Please be aware this project was required to reach fully commissioning by end 2021 when it was allocated of 350MW under Feed-in-Tariff (“FIT”) program in 2018. Back then, the project was scheduled to be commissioned in 2021 in line with the requirement, according to Ørsted's April 2018 timetable beside, Heerema, the installer of 111 turbines foundations and 2 large offshore substations claimed they would working during 2021 and 2022.
Location:
Taiwan
Status:
Fully Commissioned
Capacity:
605.2 MW
4C Offshore | Location Map: Lat(24.154) Lon(119.946)

Subscribers can track wind farms on their dashboard.

General Information
Name
Greater Changhua 1 - South East
Other Names
大彰化東南離岸風力發電計畫 SE Greater Changhua Offshore Wind Farm Da-Chang-Hua (Greater Changhua) Offshore Wind Farm Changhua 1-7 - Development Zone Changhua 1 Zop 15
Country
Taiwan
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Greater Changhua Offshore Wind Farm SE Ltd. (大彰化東南離岸風力發電股份有限公司 )

Greater Changhua Offshore Wind Farm SE Ltd. (大彰化東南離岸風力發電股份有限公司 )

Operator

Ørsted Taiwan Limited (Woxu Energy)

Ørsted Taiwan Limited (Woxu Energy)

Owner

Ørsted Taiwan Limited (Woxu Energy)

Ørsted Taiwan Limited (Woxu Energy)

Owner

Caisse de dépôt et placement du Québec

Caisse de dépôt et placement du Québec

Owner

Cathay Capital Private Equity (國泰永續私募股權基金)

Cathay Capital Private Equity (國泰永續私募股權基金)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
TWD 5516/MWh (EUR 160.74/MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
605.2 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
South China Sea
Latitude
24.153867°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life