01 Aug 2022: Scoping Report submitted to the Planning Inspectorate; "This Scoping Report is intended to provide all of the information required under the EIA Regulations to allow a Scoping Opinion to be granted. It presents an overview and description of the Project as well as a review of the potential impacts associated with the construction, operations, maintenance, and decommissioning phases of the Project on the physical, human and biological environments. It goes on to propose a proportionate approach to addressing potential impacts through the EIA process and, where appropriate, by the adoption of mitigation measures. The proposed approach builds on and makes reference to agreements already made through discussion with stakeholders regarding selected topics, prior to the publication of this report"
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
1500 MW
4C Offshore | Location Map: Lat(53.568) Lon(1.285)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
53.568367°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
7
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
6
Average Length per Cable
Comments
Expected Life