08 Dec 2021: Northland Power opened a public consultation on the proposed project. Environmental permits obtained by Oceanic Wind (formerly Naikun) through the issuance of its EA Certificate on 10th December 2009 have since expired. Northland has decided to make its own application for a Licence of Occupation for investigation related to the same Project Site and Meteorological Mast (Met Mast) as previously licenced to Oceanic Wind (formerly Naikun). The consultation document follows the template provided via FrontCounter BC for Investigative Plans, including: Project Overview, First Nations Consultations, Location, Location Justification, Infrastructure Improvements and Access, referring to both the Project Site and Met Mast. The consultation is open until 27th January 2021.
Location:
Canada
Status:
Concept/Early Planning
Capacity:
400 MW
4C Offshore | Location Map: Lat(53.970) Lon(-131.482)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
400 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Pacific Ocean
Latitude
53.969559°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life