30 Jun 2023: The Danish Energy Agency published the draft procurement material for upcoming 6 GW offshore wind tenders (1 GW Kattegat; 1 GW Kriegers Falk II, 0.8-1.2 GW Hesselo; 3 GW North Sea I) and 3 GW Bornholm Energy Island windfarms. It is the implementation of the political supplementary agreement, which was adopted on May 30th 2023 for an additional 9 GW by 2030. The procurement material is subject to a market dialogue with the relevant market players until the end of August 2023. Two technical workshops on requirements regarding the grid connection in case of overplanting, will also be held with Energinet in Copenhagen on August 29, 2023 for the 6 GW (radial parks) and on September 6, 2023 for the Energy Island Bornholm. Overplanting is possible for Kriegers Flak II, Kattegat and North Sea I within the limitation from the SEA. It is limited to 400 MW for Hesselø. The final procurement material is expected to be published by the turn of the year with expected deadline for the best and final offer by the end of 2024 for the wind farms the North Sea, Hesselø and Energy Island Bornholm and in first half of 2025 for Kattegat and Kriegers Flak II.
Location:
Denmark
Status:
Development Zone
Capacity:
6978 MW
4C Offshore | Location Map: Lat(55.920) Lon(7.170)

Subscribers can track wind farms on their dashboard.

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
6978 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
55.918093°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life